CALL US:714.899.2300
of

The Challenge

With limited roof space available, the homeowner wanted to eliminate her electric bill while incorporating the required fire offsets.

The Solution

By installing (18) Sharp Electronics higher-efficiency panels, we were able to increase the output per square foot – using a flashed attachment method to prevent future leaks – all on time and on budget.

The Result

For the past 4 years, our customer’s utility bill has generated a surplus, resulting in annual reimbursements from SCE.

Quick Facts


PPG Capabilities Utilized

Location

Rossmoor


Project Size

4.23kW


Project Duration

3 Days


Find out How Pro Power Group can Take on Your Project

REQUEST A CALL