CALL US:714.899.2300
of

The Challenge

Installing a completely off-grid PV system for a dog park operated by the City of Long Beach.

The electric utility gave bids to bring utility power into the dog park at an extremely high price. The challenge was to install a PV system to save the city money to power dust to dawn lights.

Our Solution

We designed an of-grid system utilizing batteries and charge controllers for a pole mount solar array.

Client Response

The City powered the dog park with solar at a fraction of the price compared to utility power and the park is completely “green”.

Quick Facts


PPG Capabilities Utilized

Location

Long Beach , CA


Project Size

1.3 kW


Project Duration

2 days


Material Used

6 x 220W panels, batteries, charge controllers, DC distribution

Find out How Pro Power Group can Take on Your Project

REQUEST A CALL