CALL US:714.899.2300
of

The Challenge

The homeowner wanted to incorporate a solar system into the new custom home he was building.

 

 

The Solution

Working with our customer’s architect and general contractor, we were able to include a solar system comprised of (28) Sharp Electronics panels in the construction phase of his project.  We installed rolled composition tiles (which are not visible) below the solar panels and Spanish tile on the exterior for aesthetic appeal.

The Result

Our customer was thrilled with the interaction between our crew and their architect and general contracting, resulting in a project that was on time, on budget and hassle-free.

Map


View Larger Map

Quick Facts


PPG Capabilities Utilized

Location

Seal Beach


Project Size

4.9kW


Project Duration

9 Months


Find out How Pro Power Group can Take on Your Project

REQUEST A CALL